Home / Manufacturing & Trades / Senior Regional Construction Scheduler

Hiring now · Manufacturing & Trades

Senior Regional Construction Scheduler

Element Consulting · Los Angeles, CA
Pay
$165K - $185K
Workplace
On-site
Level
Senior
Type
Full-time
Posted
Nov 12, 2026
Open for
13 days

Senior Regional Construction Scheduler is open at Element Consulting in Los Angeles, CA. The posting gives a salary of $165K - $185K. Posted on Nov 12, 2026, and still on Element Consulting’s careers page when we last checked, on Nov 24, 2026.

About the role

Minimum Requirements

Required Experience:

  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects.
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite.

Required Education:

  • Graduation from a recognized college or university with a bachelor’s degree in engineering, architecture, construction management, or any related field.

OR

  • Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four (4) years of experience in the duties above to compensate for the required education.

Required Skills:

  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics.

Duties:

  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on LAUSD’s structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on LAUSD’s structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity.
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthly schedule progress.

Salary dependent on education and experience. Salary range: $170K-$190K.

Why Choose Element Consulting?

Element Consulting is a construction management company dedicated to providing clients with responsible and innovative solutions to their project needs, from inception to completion. Based out of El Segundo, CA, the firm offers program, project, and construction management services. We invite you to join us in 'Bringing the Right Elements Together for Our Clients' Success.'

The employer’s own description, as published on Element Consulting’s careers page.

Hiring at Element Consulting

Element Consulting has 13 open roles right now. Most are in Operations, Manufacturing & Trades and Engineering. See all its roles

✓ States the pay 100% of its open roles state it✓ Few old postings 0% open 90 days or moreWhat the marks mean

More like this

Similar Manufacturing & Trades jobs

All Manufacturing & Trades jobs
Apply on company site